Skip to Main Content
Childress Painting
CSI 32 17 23

Line Striping

Parking lot striping, warehouse floor marking, and safety line work, laid out square, sprayed sharp, and compliant.

Scope
Parking Lots · Warehouses · Safety Marking
Coating Systems
Sherwin-Williams
Scheduling
Day, night & occupied-site shifts
Warranty
1-year workmanship warranty
Overview

Striping is the finish everyone sees from the street and the safety system everyone depends on inside. It is bought on straight lines, correct layout, ADA compliance, and paint that survives traffic. All of which are decided by layout discipline and product selection, not by the spray rig.

Layout Before Paint

A striping job is won or lost before the rig starts: stall counts, ADA positions, fire lanes, and flow are measured and snapped first. Restripes are trued up rather than blindly traced, because copying a crooked layout preserves the crooked layout.

Scheduled Around the Operation

Lots and warehouses cannot close for striping. Work is phased by section, run at night or on weekends where needed, and returned to service on a stated cure time.

Painting work by Childress Painting at Mckeevers, Kansas City
Systems & Substrates
Asphalt Lots
Traffic-rated waterborne or acrylic marking paint
Concrete Floors
Epoxy or urethane striping for wheel traffic
ADA Elements
Stalls, aisles, and markings to current standards
Layout
Measured and snapped before any paint is sprayed
Included in a Bid

What This Scope Actually Covers.

Listed so there is no ambiguity at award. Anything not on this list is either excluded or priced separately, and the proposal says which.

Parking lot layout and striping
ADA-compliant stall and signage marking
Fire lane and regulatory marking
Warehouse aisle and rack-row marking
Safety zones, walkways, and hazard striping
Restriping over existing layouts
Night and weekend scheduling around operations
Where This Scope Runs

Sectors That Buy This Service Most.

Common Questions

Before You Bid It Out.

Do You Verify ADA Compliance?
Layouts are marked to current ADA dimensional standards for stalls, access aisles, and signage positions, and we flag existing non-compliant layouts before restriping them.
How Long Before Traffic Can Return?
Waterborne lot paint typically accepts traffic within an hour in Texas conditions; floor systems vary by product. The proposal states the cure time for the specific system.
Bid Invitations

Add Line Striping to Your Next Bid List.

Send the plans, the specification sections, and the due date. We confirm receipt and tell you whether we are bidding, so you are never left waiting on a no-bid.