Bid Portal
Send Us the Drawings.
Four short steps. Attach plans and specification sections, tell us the due date, and we will confirm receipt and tell you whether we are bidding.
Bidding today?
If the due date is inside 48 hours, call instead of submitting the form.
- Receipt Confirmed
- We acknowledge every invitation so you know it landed and is not sitting in a spam folder on bid day.
- Bid or No-Bid, You Get an Answer
- If we are not the right fit for the scope or the schedule, we say so early instead of leaving a gap on your bid tab.
- Assumptions in Writing
- Every proposal states what is included, what is assumed, and what is excluded, so scope gaps surface before award.
What to Send
- Architectural drawings, finish plans and schedules
- Specification sections (Division 09)
- Bid due date and time
- Anticipated start and substantial completion
- Any prototype or brand finish standard
- Prevailing wage or special conditions, if applicable
What Happens Next
- 01PreconstructionTakeoff, Budget, and Schedule Position
- 02Scope ReviewAgreeing What Is and Is Not Included
- 03Product VerificationSubmittals, Colors, and Mockups
Share your drawings by link, Dropbox, Box, SharePoint, Procore, or BuildingConnected all work. Paste the link in the plans field and estimating pulls them down the same day.
