Triten Real, 4950 Stilwell
Commercial property finish-out and common-area work.
- Market Sector
- Commercial Office
- Services Performed
- 2
Commercial property finish-out and common-area work.
Project detail
This entry documents commercial project experience from our qualifications record. Photography, durations, and named references are published once the owner or general contractor approves release in writing. For a prequalification or bid, contact us and we will provide project references directly.
What This Engagement Covers.
Commercial Painting
CSI 09 91 00Full commercial painting packages for general contractors, developers, and owners, new construction, tenant finish-outs, and remodels held to the construction schedule.
- Full Division 09 painting packages for new construction
- Tenant finish-outs delivered to lease commencement dates
- Remodels phased around trading hours and occupants
- Multi-site and rollout programs to a brand prototype standard
Interior Painting
CSI 09 91 23Interior painting for commercial and residential spaces, clean lines, uniform finishes, and work sequenced around the people using the building.
- Wall, ceiling, and soffit coatings
- Trim, doors, frames, and millwork finishing
- Exposed structure and dryfall applications
- Accent walls and specialty finishes
What Goes On the Wall, and What Happens First.
Coatings are specified against the substrate and the service the surface has to take, then confirmed with the manufacturer before pricing. Nearly every finish that fails early fails in preparation, not in the can, so preparation carries its own line and its own sign-off.
- Gypsum Board
- Primer plus two finish coats to the specified sheen
- Hollow Metal
- Rust-inhibitive primer with enamel topcoat
- Exposed Structure
- Dryfall applied ahead of MEP close-in
- Exterior Envelope
- Manufacturer-specified assembly for the substrate
How This Job Was Run.
- 02
Scope Review
Scope gaps cause more disputes than any finish issue. We walk the scope line with the general contractor before award, which surfaces, which side of the demising wall, whose doors, whose ceilings, and put the answer in the contract instead of discovering it during construction.
- 04
Surface Preparation
Cleaning, profiling, moisture and adhesion testing where warranted, substrate repair, and priming to the manufacturer specification. Preparation is priced as its own line item so it is visible, and so a budget reduction is a decision not something that quietly happens.
- 06
Quality Control
We run our own quality-control inspection ahead of the general contractor's walkthrough. Coverage, sheen uniformity, cut lines, and adjacent-surface condition are checked and corrected before anyone else is asked to look at the work.
- 08
Project Closeout
Attic stock, the approved color schedule, product data, and the one-year workmanship warranty are delivered as a package at turnover. Warranty support continues after closeout. A call after closeout gets the same response as a call during construction.
Lease Commencement Dates
Delivery dates are contractual. Painting is one of the last scopes in a TI and absorbs upstream delay, so manpower is planned against the compressed schedule from the start.
Occupied Buildings
Work happens in buildings full of other tenants. Freight elevator windows, after-hours access, noise limits, and common-area protection are confirmed with building management before mobilization.
More Office Projects.
Bidding Similar Work?
Send the plans and the specification sections. We confirm receipt, tell you whether we are bidding, and state our assumptions and exclusions in writing. Call 972-863-1919.