Meat Mitch BBQ, KC Airport

Airport concession restaurant finish-out with kitchen-rated coatings, delivered in overnight access windows.

Market Sector
Aviation
Services Performed
2
Project Overview

Airport concession restaurant finish-out with kitchen-rated coatings, delivered in overnight access windows.

Project detail

This entry documents commercial project experience from our qualifications record. Photography, durations, and named references are published once the owner or general contractor approves release in writing. For a prequalification or bid, contact us and we will provide project references directly.

Scope of Work

What This Engagement Covers.

Commercial Painting

CSI 09 91 00

Full commercial painting packages for general contractors, developers, and owners, new construction, tenant finish-outs, and remodels held to the construction schedule.

  • Full Division 09 painting packages for new construction
  • Tenant finish-outs delivered to lease commencement dates
  • Remodels phased around trading hours and occupants
  • Multi-site and rollout programs to a brand prototype standard

Protective Coatings

CSI 09 96 00

High-performance protective coatings for steel, concrete, and equipment, selected against chemical exposure, washdown, abrasion, and weather.

  • Structural steel protective systems
  • Chemical- and washdown-resistant wall coatings
  • Tank exteriors and equipment coatings
  • Secondary containment systems
Systems & Preparation

What Goes On the Wall, and What Happens First.

Coatings are specified against the substrate and the service the surface has to take, then confirmed with the manufacturer before pricing. Nearly every finish that fails early fails in preparation, not in the can, so preparation carries its own line and its own sign-off.

Gypsum Board
Primer plus two finish coats per the finish schedule
Hollow Metal
Rust-inhibitive primer with enamel topcoat
Exposed Structure
Dryfall applied ahead of MEP close-in
Exterior Envelope
Manufacturer-specified assembly for the substrate
Project Approach

How This Job Was Run.

  1. 02

    Scope Review

    Scope gaps cause more disputes than any finish issue. We walk the scope line with the general contractor before award, which surfaces, which side of the demising wall, whose doors, whose ceilings, and put the answer in the contract instead of discovering it during construction.

  2. 04

    Surface Preparation

    Cleaning, profiling, moisture and adhesion testing where warranted, substrate repair, and priming to the manufacturer specification. Preparation is priced as its own line item so it is visible, and so a budget reduction is a decision not something that quietly happens.

  3. 06

    Quality Control

    We run our own quality-control inspection ahead of the general contractor's walkthrough. Coverage, sheen uniformity, cut lines, and adjacent-surface condition are checked and corrected before anyone else is asked to look at the work.

  4. 08

    Project Closeout

    Attic stock, the approved color schedule, product data, and the one-year workmanship warranty are delivered as a package at turnover. Warranty support continues after closeout. A call after closeout gets the same response as a call during construction.

How Aviation Work Runs

Badging and Security

Crews are badged, escorted where required, and tool and material lists are cleared in advance. Lead time for credentialing is treated as part of the schedule, because it is.

Live Passenger Operations

Terminals do not close. Work happens overnight or behind barricade, with the area returned clean and open before the first bank of departures.