Blue Valley School District

District-wide painting program across elementary, middle, and high school campuses, executed within the summer window.

Market Sector
Education
Services Performed
3
Project Overview

District-wide painting program across elementary, middle, and high school campuses, executed within the summer window.

Project detail

This entry documents commercial project experience from our qualifications record. Photography, durations, and named references are published once the owner or general contractor approves release in writing. For a prequalification or bid, contact us and we will provide project references directly.

Scope of Work

What This Engagement Covers.

Interior Painting

CSI 09 91 23

Interior painting for commercial and residential spaces, clean lines, uniform finishes, and work sequenced around the people using the building.

  • Wall, ceiling, and soffit coatings
  • Trim, doors, frames, and millwork finishing
  • Exposed structure and dryfall applications
  • Accent walls and specialty finishes

Exterior Painting

CSI 09 91 13

Exterior painting over tilt-wall, stucco, EIFS, masonry, siding, and steel, bought on how long it lasts, which is decided by preparation.

  • Tilt-wall and precast concrete coatings
  • Stucco and EIFS repaint, including elastomeric systems
  • Masonry, brick, and CMU coatings
  • Siding, fascia, and trim on residential exteriors

Maintenance Painting

SVC / MNT

Repaint and maintenance programs for occupied buildings, phased, off-hours, and returned to service every morning.

  • Facility repaint programs, phased by zone
  • Night, weekend, and off-hours shifts
  • Common area and corridor refresh work
  • Low-VOC and low-odor system specification
Systems & Preparation

What Goes On the Wall, and What Happens First.

Coatings are specified against the substrate and the service the surface has to take, then confirmed with the manufacturer before pricing. Nearly every finish that fails early fails in preparation, not in the can, so preparation carries its own line and its own sign-off.

Gypsum Board
Primer plus two finish coats to the specified sheen
Trim and Doors
Waterborne or alkyd enamel per the schedule
High-Touch Areas
Scrubbable, high-hide washable systems
Occupied Spaces
Low-VOC systems with minimal cure odor
Project Approach

How This Job Was Run.

  1. 02

    Scope Review

    Scope gaps cause more disputes than any finish issue. We walk the scope line with the general contractor before award, which surfaces, which side of the demising wall, whose doors, whose ceilings, and put the answer in the contract instead of discovering it during construction.

  2. 04

    Surface Preparation

    Cleaning, profiling, moisture and adhesion testing where warranted, substrate repair, and priming to the manufacturer specification. Preparation is priced as its own line item so it is visible, and so a budget reduction is a decision not something that quietly happens.

  3. 06

    Quality Control

    We run our own quality-control inspection ahead of the general contractor's walkthrough. Coverage, sheen uniformity, cut lines, and adjacent-surface condition are checked and corrected before anyone else is asked to look at the work.

  4. 08

    Project Closeout

    Attic stock, the approved color schedule, product data, and the one-year workmanship warranty are delivered as a package at turnover. Warranty support continues after closeout. A call after closeout gets the same response as a call during construction.

How Education Work Runs

The Summer Window

Between the last day of school and staff return, there are roughly ten workable weeks. Multi-campus programs are staffed to run in parallel, with a per-campus completion date instead of one program-wide finish line.

Occupied-Building Standards

Buildings that host summer programs, athletics, and administration are never fully empty. Zoning, low-odor systems, and daily cleanup are planned as though students are present, because some of them are.